<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title><![CDATA[R&H Railway Consultants (Pty) Ltd]]></title><description><![CDATA[Articles]]></description><link>http://www.rhrailway.co.za/</link><copyright><![CDATA[Copyright R&H Railway Consultants (Pty) Ltd]]></copyright><generator>sNews CMS</generator><item><title><![CDATA[Transnet Corridor Studies]]></title><description><![CDATA[  
    Client :   Transnet Projects    Location	:   Johannesburg, 
    Involvement :   Rail Network Capacity Studies
    Value :   R8 million
    Purpose :   Feasibility Study to determine current installed 		infrastructure capacity and to develop capacity 		increase proposals to satisfy next 30 years
    Duration :   September 2006 – December 2007
  

  During 2006, R&amp;H was contracted by the Hatch, Mott MacDonald and Guba “HMG” Joint Venture to conduct a pre-feasibility study on the entire Transnet Freight Rail network. The aim of this study is to determine the current installed rail infrastructure network capacity and to develop a 30 year investment strategy and plans that will be able to cater for future South African transportation needs. The output of the study is a “30 Year National Rail Infrastructure Plan”.  

  For more information,   download pdf project sheet   (to save this file, right click on the link, and choose the 'save as' option).  ]]></description><pubDate>Tue, 05 Feb 2008 16:19:54 +0000</pubDate><link>http://www.rhrailway.co.za/projects/transnet-corridor-studies/</link><guid>http://www.rhrailway.co.za/projects/transnet-corridor-studies/</guid></item><item><title><![CDATA[Moatize Coal Project]]></title><description><![CDATA[  
    Client :   Rio Doce Mozambique    Location	:   Beira and Moatize Mozambique, 
    Involvement :   Feasibility Studies and Designs
    Value :   R2 million
    Purpose :   To conduct feasibility studies into train operations and th detailed design of the relocation of the existing railway line
    Duration :   September 2007 - January 2008
  

  R&amp;H was appointed by RDMZ a subsidiary of CVRD (Brazil) to assist in various feasibility studies regarding train operations and associated infrastructure along the Moatize-Beira railway line. R&amp;H also completed a detailed design of a 10.3km relocation of the existing railway line connecting Moatize with the Sena line.  

  For more information,   download pdf project sheet   (to save this file, right click on the link, and choose the 'save as' option).  ]]></description><pubDate>Tue, 05 Feb 2008 15:30:02 +0000</pubDate><link>http://www.rhrailway.co.za/projects/moatize-coal-project/</link><guid>http://www.rhrailway.co.za/projects/moatize-coal-project/</guid></item><item><title><![CDATA[Career Privacy Policy]]></title><description><![CDATA[  R&H understands that privacy online is important to users of our website, especially when conducting business and as such, we respect all principles of employment equity and applicable privacy of information legislation.  

  Any resume or personal information you share with us will be stored in secure R&H databases.  By providing your application, you authorize R&H to maintain any documentation provided for consideration relating to any suitable positions, including those to which you have not directly applied, for a period of two years.  

  Please note that no information received by R&H through our website will be shared with third parties. In forwarding your documentation, you agree to these terms.  

  Please note that only candidates selected for an interview will be contacted with in two weeks after applying.  

  I agree with the above mentioned terms and conditions.  ]]></description><pubDate>Tue, 05 Feb 2008 14:00:18 +0000</pubDate><link>http://www.rhrailway.co.za/careers/career-privacy-policy/</link><guid>http://www.rhrailway.co.za/careers/career-privacy-policy/</guid></item><item><title><![CDATA[Sishen South Direct Link]]></title><description><![CDATA[  

    Client :   HMG Joint Venture
    Location	:   Northern Cape, South Africa
    Involvement :   Detail design and procurement
    Value :   R500 million
    Purpose :   To design a rail link between the Sishen South Mine and the Sishen Saldanha Ore Line
    Duration :   April 2007 – April 2008  

  R&H was appointed by HMG Joint Venture for the design and the procurement of a rail link between the Sishen South Mine and the Sishen Saldanha railway line. The preferred route, which connects directly to the Sishen Saldanha Line (at approximate ch 820km), is approximately 32km long. The line will comprise a single heavy haul line (60kg/m rails on PY concrete sleepers on ballast profile of 1600 m³/km) electrified at 50 kV a.c. and connecting the Sishen Saldanha line with a 1:20 right hand turnout. The line will carry 30 ton axle load traffic of 9 million tons per annum.  

  For more information,   download pdf project sheet   (to save this file, right click on the link, and choose the 'save as' option).  

]]></description><pubDate>Wed, 30 Jan 2008 16:14:34 +0000</pubDate><link>http://www.rhrailway.co.za/projects/sishen-south-direct-link/</link><guid>http://www.rhrailway.co.za/projects/sishen-south-direct-link/</guid></item><item><title><![CDATA[Goedgevonden New Private Siding]]></title><description><![CDATA[  
    Client :   Xstrata Coal (S.A.) (Pty) Ltd
    Location	:   Ogies, Mpumalanga, 
    Involvement :   New Private Siding
    Value :   R134 million
    Purpose :   To link the Mine's new rapid loadout facility to the export coal line
    Duration :   April 2007 – November 2008
  

  R&H was appointed by Xstrata Coal SA for the design and construction supervision of a new private siding for their Goedgevonden Mine.  

  The siding is to take off from the 3rd Coal Line near the Saaiwater Station, including a Domestic Link. It will run from the Saaiwater Station, crosses the Coal line, Saaiwaterspruit, Ogies to Bethal Road (R545) and terminates in a balloon near the proposed Colliery.  

  For more information,   download pdf project sheet   (to save this file, right click on the link, and choose the 'save as' option).  