Moatize Coal Project
Client : Rio Doce Mozambique
Location : Beira and Moatize Mozambique,
Involvement : Feasibility Studies and Designs
Value : R2 million
Purpose : To conduct feasibility studies into train operations and th detailed design of the relocation of the existing railway line
Duration : September 2007 - January 2008
R&H was appointed by RDMZ a subsidiary of CVRD (Brazil) to assist in various feasibility studies regarding train operations and associated infrastructure along the Moatize-Beira railway line. R&H also completed a detailed design of a 10.3km relocation of the existing railway line connecting Moatize with the Sena line.
For more information, download pdf project sheet (to save this file, right click on the link, and choose the 'save as' option).

